HY-PCC-30A(12V 50A Battery Charger)
Work Patterns:
On-grid, off-grid and backup pattern.
Backup Power:
Maximum of 10000 watts, switchover(UPS)within 10ms.
Safety:
Ground fault protection and arc fault protection(AFCI).
Parallel Extension:
Support both single phase and three phase parallel configuration with a maximum of 10 units.
Smart Monitoring:
Huayu Portal smart monitoring platform provides real-time operating status and historical data.

Overview
Huayu's HYC series of PWM Charge Controller is equipped with two USB ports and LCD display that adopts the most advanced digital technique. The multiple load control modes enable it can be widely used on solar home system, traffic signal, solar street light, solar garden lamp, etc.
Product Highlights
- 12V/24V System Voltage Automatically Detect
The controller support both 12V and 24V systems and detect 12V or 24V DC system voltages once connected to a Lead-acid (Sealed/Gel/Flooded) battery.
- 4-Stage Intelligent PWM Charging
The controller owns a 4-Stage Intelligent PWM Charging - Bulk, Boost, Float and Equalization, and temperature compensation can effectively prolong the battery lifespan and significantly improve the system's performance.
- LCD Display Design
The controller is equipped with built in LCD display that adopts the most advanced digital technique, dynamically displaying device’s operating data and working condition
- Double USB Design
The controller has two USB port, easily supply charge for electronic equipment.
- Multiple Load ControlModes
The multiple load control modes enable it can be widely used on solar home system, traffic signal, solar street light, solar garden lamp, etc.
Application Scenario


Q: If the inverter can work in pure off grid application?
A: Yes, this inverter support pure off grid running for islands.
Q: If the inverter can work in three phase system or three phase mete?
A: Yes, the inverter can work with three phase meter and will get power for the other two phases and give compensate to the other two phases. For example: Phase A Load: 500W, Phase B Load: 600W, Phase C Load: 700W, then inverter will output 500+600+700=1800W in phase A. In some countries, the export power of phase A will compensate the cost of phase B and phase C, so please contact the power company before install a three phase meter.
Q: How can I keep battery capacity when there is grid in case of load shedding?
A: You can enable charge priority in the monitoring system and then the solar will used to charge battery first, the battery will not discharge until load shedding, this function is usable for the area where always has load shedding.
Q: Can I control the generator by the inverter?
A: Yes, a external control box (please check with your installer or distributor if you need it) is needed, and your generator should support external control function. The generator will be automatically started when battery voltage is lower than the cut-off value or there is charge request or stop charge flag is set.
Q: Why can’t I monitor the each units although I set the right password and add all data loggers in the monitoring system?
A: Please check
(1) CAN cable connection is connected to the right COM port,
(2) If you have make the parallel communication cable yourself, please make sure you have make the right cable, otherwise, it will interrupt the Wi-Fi communication.
Q: How can I monitor and configure the inverter when the network is not available at site ?
A: You can monitor and configure the inverter by local connection that is available in the Huayu Portal APP.